Dear Experts
My client requirement is:
Production department will create a breakdown notification with basic details. after that maintenance engineer will maintain the why why analysis. Then it will be saved. After that Section head will approve(in ztcode) the why-why analysis. then after his approval the HOD will approve(same ztcode) it. then only the notification will be completed. If any changes in Why-why HOD will be sent back for change. How to map this in SAP worklfow.
Thanks
Sandhya Raju