HI,
I was trying to re-trigger the Work flow after changing the Quantity.
for example below is the level of approvals and the limit I have.
Level Limit
1 1 - 1000
2 1001 - 5000
3 5001 - 10000
1. Now, I have entered the PR quantity as 9000 ( which is last bucket ) and partially approved till level 2 (so here till level 2 was approved )
2. and then I have changed the Quantity to 5001 (Which is same bucket ) and saved the PR. But the approval levels shows still the same level 2.
But here I'm expecting to start the approval level from level 1, when I change the Quantity from 9000 to 5001.
Could some please provide me the pointers.
Regards,
KV